BROOKLINE, MA · TOWN OF BROOKLINE
As-Built Drawings in Brookline, MA
ADS (As-Built Drawing Services) turns LiDAR scans into drawing sets that architects, engineers and facilities teams can rely on. In Brookline we surveyed a seven-story, 51,542 sq ft storage facility in November 2024 and delivered a point cloud of every floor, a 360° walkthrough, floor plans, reflected ceiling plans and elevations, with annotated CAD and PDF sheets organized by level.
✓
Travel is a separate line
✓
Your building stays open
✓
You own every file

STORAGE FACILITY · 51,542 SQ FT · NOV 2024
LEDGER 01 · OUR WORK IN BROOKLINE
What was measured and what was delivered
Our Brookline reference is a big one, so it is set out here as a ledger. Section A is what the crew measured on site. Section B is what the drafting team issued. Section C is what happened after delivery.
WAREHOUSE FACILITY IN BROOKLINE
NOV 11 TO 25, 2024
REF
ENTRY
DETAIL
AMOUNT
A · MEASURED ON SITE
A-01
Levels scanned
A complete LiDAR survey of the building, every floor.
7 levels
A-02
Floor area
A storage facility in the busy town center.
51,542 sq ft
A-03
Storage units
Each unit captured so it could be modeled individually.
Unit by unit
A-04
Split levels
Split-level units, stairs and sublevels tied into the main floors.
Included
A-05
Irregular layouts
Non-linear floor geometry aligned by cross-referencing the point cloud.
Aligned
A-06
Dim corridors
Scanner placement and data correction used in dark or obstructed areas.
Covered
A-07
Exposed MEP
Visible mechanical, electrical and plumbing runs and vertical systems.
Recorded
B · DRAWN AND DELIVERED
B-01
Point cloud
High-density scan data.
All floors
B-02
360° digital walkthrough
For project coordination and review.
Whole building
B-03
Floor plans
Architectural as-built plans.
Per level
B-04
Reflected ceiling plans
Ceiling layouts drawn from the scan.
Per level
B-05
Elevations
The building faces, drawn from the scan.
Issued
B-06
CAD and PDF sheets
Fully annotated AutoCAD sheets, organized per level and prepared for layout and submission.
Per level
B-07
Revit model
Units, stairs, sublevels and vertical systems.
Modeled
C · AFTER DELIVERY
C-01
Additional deliverables
The request began as a simple floor plan and grew. The extra sheets came from the same dataset.
0 return visits
REMARKS FROM THE CLIENT
“The scope grew, kept up at every step”
Having the scan made it easy to request more.
David Williams, Director of Market Development at SSG Development, LLC
The documentation supports facility management, future upgrades and long-term operational planning across all levels. View the full project →
PLATES

P.1 The building in its block, highlighted.

P.2 Storage units, each modeled on its own.

P.3 Point cloud, cut away to show the floors.

P.4 One level in plan, unit by unit.
LEDGER 02 · WHAT YOU CAN ORDER
Six lines you can put on a Brookline quote
Every quote is itemized. Point cloud and 2D CAD is the base tier. A Revit model and MEP add scope. If your needs grow later, more sheets can be drafted from the scan you already have.
REF
S-01
S-02
S-03
S-04
S-05
S-06
LINE
WHAT YOU RECEIVE
A registered 3D point cloud and a 360° digital walkthrough for coordination and review.
2D CAD in AutoCAD and PDF: floor plans, reflected ceiling plans, elevations and sections.
A Revit model at LOD 200 to 300.
Mechanical, electrical, plumbing and structural elements where scoped.
The building drawn on its lot.
BOMA area calculations on request, for lease plans and facility records.
FILE FORMATS
DWG
RVT
IFC
NWC
E57
Matterport

P.5 Front and back elevations.
LEDGER 03 · PERMITS AND REVIEW
Town of Brookline Building Department
Your architect or engineer files the application, and applications must include plans. Our set is the existing-conditions base.
Address
Phone
Hours
A permit is required to
The application needs
Review, most applications
Review, larger projects
333 Washington Street, Brookline MA 02445
617-730-2100
Monday to Thursday 8 am to 5 pm. Friday 8 am to 12:30 pm.
Construct, alter, repair, remove or demolish a building, change its use or occupancy, or install equipment regulated by the Massachusetts State Building Code (780 CMR).
Plans, licenses, an insurance certificate and the fee.
7 to 10 days
Up to 30 days for larger commercial projects and new one- and two-family dwellings.
WHERE WE WORK
Brookline Village, Coolidge Corner, Washington Square, Chestnut Hill and Longwood. Across the line in Boston: Fenway, Back Bay, Allston and Jamaica Plain. Also Newton and Cambridge.
MORE NORTHEAST PAGES
LEDGER 04 · QUERIES
Brookline FAQ
Q-01
Do you handle multi-story commercial and industrial buildings?
Q-02
Can I ask for more drawings after the scan is finished?
Q-03
Does the building have to close during the survey?
Q-04
Who issues building permits in Brookline?
Q-05
How do you scan dark corridors and blocked sightlines?
Q-06
What sets the cost of a survey in Brookline?
Yes. ADS has documented seven levels of split-level storage in Brookline, a 565,308 sq ft state office campus in Poughkeepsie and a 126,500 sq ft office building in Miami. Each level is scanned and registered so floors stack correctly in the model.
Yes. The Brookline facility was scanned once, and when the owner's scope grew, the extra sheets came from the same dataset without a second visit.
No. The storage facility stayed open during the survey. ADS works around tenants and staff and can scan outside hours where needed.
The Town of Brookline Building Department issues them. A permit is required to construct, alter, repair, demolish or change the use of a building under the Massachusetts State Building Code (780 CMR), and applications must include plans. The ADS set is the existing-conditions base your architect or engineer files. The town says most applications take 7 to 10 days to review and larger commercial projects up to 30.
Low light and obstructions are handled with scanner placement and data correction on the job. ADS uses Leica RTC360 and BLK2GO scanners and the Matterport Pro3 and drafts from the registered point cloud.
Floor area, number of floors, how much is inside, the deliverables you need and travel set the price. A storage facility with hundreds of units takes more drafting than an open warehouse. Point cloud and 2D CAD is the base tier, and a Revit model and MEP add scope. Every quote is itemized.

P.6 Street fronts and the floors behind them, in one dataset.
ELSEWHERE IN THE NORTHEAST
A 6,200 sq ft residence in Greenwich, Connecticut, scanned in phases around snow in early 2025, and a 2,500 sq ft office suite in Manhattan.
LEDGER 05 · GET A QUOTE
Open an entry for your Brookline building
Send the address, approximate square footage, number of floors and the deliverables you need. ADS has no New England office. The technician travels in and travel is a separate line on the quote.
PREFER TO TALK?
USEFUL TO SEND
Property address
Square footage and number of floors
What the drawings are for
Deliverables you need
Your deadline
Existing drawings, even old ones